Credential case · Aerospace enclave · Target Final status
Aerospace enclave Final assessment
Lifecycle position
Completed stages stay quiet while the current coordination stage remains prominent.
Requirement recorded
Contracting source established Level 2 need.
Contracts owner
Assessment scope locked
Aerospace enclave v3 selected for provider coordination.
Program owner
Assessment coordination
Provider readiness session shifted; response plan open.
Assessment lead
Record external result
Authorized user records external status, source, and UID.
Affirming Official
Current implication
Keep the Final-status target, but resolve provider schedule impact before assigning the status-recording package.
Explain rule
This is a coordination deadline. It helps protect assessment timing but does not record an official CMMC status.
- Date basis
- Provider readiness session rescheduled to 2026-07-03.
- Formula
- Use the next externally coordinated assessment milestone.
- Rule pack
- Continuity planning rule · 2026.06.0
- Sources
- Provider coordination record; Lifecycle case schedule
Explain rule
The linked contract date is shown as a consequence of assessment timing. The product does not decide award eligibility.
- Date basis
- Linked option review milestone recorded as 2026-08-13.
- Formula
- Compare target Final status timing with linked contract milestone.
- Rule pack
- 2026.06.0
- Sources
- Contract milestone registry; Lifecycle case target date
Relationship map
The case stays connected to the contract milestone and active scope version used for readiness work.
Case relationship map
These links make the business consequence and assessed boundary available before schedule or result decisions are recorded.
- Aerospace enclave Final assessmentAerospace support IDIQ
- Relationship
- Supports contract requirement
- State
- Schedule narrowed
- Implication
- Option review timing is the main schedule risk.
- Aerospace enclave Final assessmentAerospace enclave scope
- Relationship
- Uses assessed boundary
- State
- Active v3
- Implication
- Readiness decision is pinned to active scope version v3.
Linked contract consequences
The case view names affected business records without presenting a product inference as confirmed contract language.
| Contract | Required status | Business date | Risk |
|---|---|---|---|
| Aerospace support IDIQ | Level 2 Final | 2026-08-13 | Schedule narrowed |
| Sustainment task order | Level 2 Conditional accepted | 2026-09-30 | Covered |
Current stage checklist
Each item has an owner, completion expectation, and explicit relationship to the current lifecycle stage.
- Complete
Scope version and CAGE codes confirmed for provider package
Mira Patel
- Due Jul 03
Provider readiness session impact reviewed
Jamal Coleman
- Not started
Final source packet prepared for status recording
A. Reyes
Assessment records
Coordination details stay separate from externally awarded status facts until an authorized user records the result.
External provider and commercial record
- Provider
- Northstar Assessment Group
- Commercial reference
- MSA-2026-17 · Assessment order 004
- Provenance
- Recorded from provider note
Assessment schedule
- Readiness session
- 2026-07-03 · shifted by provider · manage sessions
- Assessment window
- 2026-07-22 through 2026-07-26
- Target status record
- 2026-08-30
Requests, findings, and exports
References are metadata only in this hosted MVP fixture; source content is not requested or stored.
| Reference | Item | Owner | State |
|---|---|---|---|
| REQ-014 | Provider requested updated system boundary summary | Mira Patel | Preparing response |
| FND-002 | Clarification on managed service provider responsibility | Jamal Coleman | Internally reviewed |